About Jilong
 
 
 

Contact Us
 
 
Jilong History  

In 1989, JiLong Wang, the general manager of the company. He was only 17 years old, but had started setting foot in machinery industry. By making great efforts,he was promoted to be a workshop director from a checker and operator.
In 1993, Jilong Wang established the business with RMB 15000, set up a family mill factory- the Jilong Machinery Plant.
In 2001, Zhejiang Jilong Machinery CO.,Ltd was founded with registered capital of 5 millions.
In 2002, the sales&service center was set up at Shengze, Jiangsu province
In 2002, the sales&service center was set up at Wangtai, Shandong province.
In 2003, the production base was built in Zhejiang with the floor space of 10000 ©O.
In March of 2011, the production base was built in Anhui with the floor space of 35000 ©O.
In August of 2011,the policy of expanding the Zhejiang production base was put into practice, and the floor space was 20000 ©O.

......

 

© 2001-2012, Zhejiang Jilong Machinery Co. Ltd All Rights Reserved.